Our Quotation & Verification Commitment
Our metallurgical and export engineers check every parameter to guarantee compliance before quoting.
- 100% verification of mechanical/chemical property specs by metallurgical engineers
- Direct mill quota allocation checking and fastest port departure schedules
- Official commercial quotation including EN 10204 3.1 MTC sample and seaworthy packing plan
Procurement & Export Clarifications (FAQ)
What is your MOQ and do you support LCL consolidation?
Standard MOQ varies by product (e.g., 5 tons for coils, 1 ton for pipes). We support LCL mixed container loading from Qingdao/Tianjin ports for trial orders.
How fast can I get a quote, and what is the typical lead time?
Standard specifications are quoted within 2 hours. Production takes 15–30 days, backed by real-time steel mill tracking and logistics milestones.
What certificates do you provide, and is SGS inspection allowed?
We supply EN 10204 3.1 Mill Test Certificates (MTC) with every batch. 100% support for SGS, TÜV, or other third-party inspections before loading.
What payment terms do you accept, and where do you ship from?
We accept T/T (30% deposit + 70% balance against BL copy) and L/C at sight. Main shipping ports are Qingdao Port and Tianjin Port.
Engineering Procurement Specification Intake
Only name, email, and product are required. Send now — optional specs speed up formal pricing.
Inquiry source & product context
No deep-link context detected — fill specs below to request a quote.
- Product
- Source path
- Grade / standard
- Form
Attribution id:
Demande envoyée. Nous répondons sous 2 heures ouvrées, ou le jour ouvré suivant hors horaires.
Prochaines étapes
- 1 L’équipe export vérifie nuance, taille et port sous 2 heures ouvrées.
- 2 Si des infos manquent, nous envoyons une courte checklist avant le devis formel.
- 3 Pour les urgences, continuez sur WhatsApp avec le même contexte produit.